Real Property / Development · Commercial Gateway

9th & !rie.

Stroudsburg, Pennsylvania

Route 611 Commercial Corridor

Stroudsburg–Bartonsville Commercial Context

9th & !rie. sits within an established Route 611 commercial corridor with regional connectivity to I-80.

Complete owner-approved Route 611 Commercial Corridor exhibit showing 9th and Irie, surrounding commercial nodes, I-80 project and access context, project-control detail, selected corridor retailers and source attribution

I-80 Project / Access Context

Regional access at useful scale.

The approved source exhibit shows the project's relationship to the I-80 / PA 611 interchange and the surrounding roadway network. It provides context and does not represent completed, approved or guaranteed access.

Approved I-80 Project and PA 611 access-context source exhibit
I-80 Project / Access Context · Approved source exhibit

Current Controlled Assemblage

±19.48 AC

Approximately 19.48 acres based on the currently reconciled parcel record; subject to final survey and controlling-instrument confirmation.

Current controlled assemblage map identifying 1409, 1463 and the controlled rear portion of 1471 with a unified red-family boundary treatment
140914631471 Rear

Potential Assemblage / Study Area

±25 AC

Broader potential assemblage and diligence study area. Potential acreage shown is not a statement of ownership or control and remains subject to transaction, survey, engineering and other diligence.

Yellow-outline potential assemblage and diligence study-area exhibit, visually distinct from the current controlled assemblage
Potential assemblage / diligence study area · Not current control

Due Diligence / Topographic Study

Project diligence

Detailed site studies and controlled project materials are available to authorized recipients.

Enter Project Room
Destructively flattened, low-information public preview conveying the character of a professional topographic study without exposing site geography or engineering detailProject Room
Public-safe diligence preview · Protected source detail withheld

Protected Project Room · 20 materials

The controlled project record begins here.

The current package contains 20 controlled materials. Team V separately preserves a 72-object source vault. Historical documents may retain earlier acreage, counterparty or development assumptions as supporting evidence; they do not control the current public positioning.

Open Project Room Authorization is verified before protected materials are shown. No protected source-vault object or Document-20 endpoint is loaded or exposed on this public profile.

Possibility

A site with expansive possibility.

Developers and investors are invited to begin a conversation with Team V.

Let's Connect Project diligence remains controlled and requires separate authorization. No protected access is granted from this profile.
Return to Team V